Home About Us Acts & Rules Lifts Cinemas Electricity Tax Electrical Safety EHV/ HV/ MV Installations Electrical Testing Energy Conservation Suggestion/ Complaint Citizen Charter Contact Us Links
   

Download Challans

Procedure for Submission of  Drawings for Scrutiny

Rule 63 Inspection

I.)    New Electrical Installations

1)    Consumer intending to install  New EHV or HV Installations, IPPs, CPPs, Actual User of Energy, Wind mill etc.. should in coordination with licensed Electrical Contractor prepare and submit the drawings for the proposed installation to the Chief Electrical Inspector to Govt., Chennai-32 for scrutiny. The following are to be submitted:

    (i) Drawings for Electrical scheme, Physical layout of machinery, Substation layout, Site plan, etc.., of the proposed installation, duly signed by both Consumer & Contractor.
    (ii) Original remittance challan for the scrutiny fees (vide Fees G.O.) paid in to a Govt. Teasury under this dept. head of account.
    (iii) Authorization letter of Consumer for the Electrical Contractor & Consent letter of Electrical Contractor
    (iv) Supplier's load sanction letter
    (v) Memorandum & Articles of Assn. of the Company, if applicable
    (iv) Other documents if necessitated.

2)    If the above is submitted in complete shape,  the drawings will be scrutinized for conformance with rules and standards and any deviations will be included in the scrutiny report.

II    To make additions and/or alterations to existing Installation

The following are to be submitted

    (i)  Drawings for Electrical scheme, Physical layout of machinery, Substation layout, Site plan, etc.., of the proposed additions/alterations shown in distinct colours, duly signed by both Consumer & Contractor.
    (ii) Original remittance challan for the scrutiny fees (vide Fees G.O.) paid in to a Govt. Treasury under this dept. head of account.
    (iii) Authorization letter of Consumer for the Electrical Contractor & Consent letter of Electrical Contractor
    (iv) Other documents if necessitated.

Depending upon the voltage class and capacity of the proposed additions &/ alterations, the drawings are to be submitted to relevant office

S.No. Nature of Addition/Alteration Where to Submit
1 MV Additions/Alterations (excluding Generators ) of capacity up to      500 KVA/HP/KW : Concerned Electrical Inspector
2 MV Additions/Alterations (excluding Generators ) of capacity exceeding     500 KVA/HP/KW : Concerned Senior Electrical Inspector
3 HV Additions/Alterations (excluding Generators ) of capacity up to       500 KVA/HP/KW : Concerned Senior Electrical Inspector
4 All other cases Chief Electrical Inspector to Government

 

Drawing Scrutiny
Rule 47A Inspection